Three Major Issues In The Sanitary Installation Process

The decoration is in the end of the hard-wearing stage. It is the installation process of sanitary ware. Many people think that this is the decoration company and the business. It has nothing to do with the owner. In fact, this is not the case. Even if the decoration is over, it cannot be taken lightly, only for the whole process. We will do our utmost to ensure that the decoration is completed smoothly. There are three major issues in the sanitary ware installation process that must be paid attention to. I will give you a detailed introduction.


The three major issues in the sanitary installation process must be noted:


First, the installation schedule


Generally, the products that are installed by the merchant are all carried out after the foundation construction is completed. The owner needs to select the merchant brand in advance, and then agree on the installation time. If the products are not the same merchant, it is best not to choose the same. Days of installation, you can arrange the order according to the actual situation, of course, if you do not affect each other, you can install at the same time.


Second, to avoid destructive installation


Don't worry about the products that the factory directly installs. It is best to do supervise work during installation to avoid destructive installation. Before installation, you should take protective measures for the surrounding area, such as laying protective cardboard on the floor. Avoid scratching the wall during handling. When installing, avoid wall and ground cracking caused by improper operation.


Third, the installation supervision details


1, cabinet installation details


When the cabinet plate is entering the site, it is necessary to take protective measures. The general installation is to assemble the cabinet first, then install the cabinet, then install the countertop and hardware. If you need wall opening, you should see the installation workers in advance. The water and electricity diagrams are compared with the map to avoid damage to the water and electricity pipelines caused by punching. When installing the countertops and hardware fittings, special attention must be paid to see if the gap treatment of the countertops is reasonable and the surface has scratches.


2, floor covering details


When laying the floor, the most important thing is to do the basic layer treatment work. It is necessary to ensure that the base layer is level and the dry humidity is moderate. During the installation process, it is necessary to see if the installation workers have deliberately lost.


3, hardware installation details


During the installation process, there will be many small hardware accessories, such as towel racks and racks. Many of these gadgets are installed by the installer. It is important to note that the holes in the wall must be carefully Control the water circuit drawing to avoid damage to the water and electricity line due to punching.


4, pay attention to installation acceptance


Acceptance after the installation is also very necessary, to see if the product is firm, scratched, tightly connected, etc. If it is found that some damage is caused, it must be presented in person and discuss the solution.