1, check the basin Water sink components package is complete;

2. Remove the lock nut of the main body in the basin;

3, the basin will be clean around the drainage hole, in the bottom of the drainage hole to apply a circle of waterproof glass glue, and then the basin to plug into the basin drain hole, pressure close to the surface;

4, the basin will be placed on the table, from below to install the lock nut, the basin body tightly locked in the basin;

5. Finally, lift the lifting lever, lock the bottom of the lifting rod, select the appropriate lifting height (there are many small holes on the lock to adjust), with the card stuck through the lever of the lock, the whole lift-type basin installation project end.